Planetary Science

Lunar Trailblazer

Lunar Trailblazer was lost before returning science, so no publication search was run.

Orbiter · Competed · PI-led · Launched on Feb. 26, 2025 · Failure · LCC: $69M/$74M (2025 $)Life-cycle cost: NASA’s reported cost to build, launch, and operate a mission through its prime mission, plus documented partner contributions, in 2025 dollars. Extended missions are not included. Methods · Wikipedia

This mission is not yet included in the analysis: the waiting period for a failed mission with no recorded publications has not ended. Expected inclusion date: . Only lifetime data is shown. Maturity rules.